How a requirement leaves draft

Requirements can be stored. They stay drafts until a QA user signs a passing execution.

  1. An administrator cannot sign the QA step.
  2. An imported test report is evidence. It does not move a requirement to verified.
  3. Two different people sign before a summary is approved.

The agreement for the study says who accepts the records.